Projects

  • AC Electrical Interference modeling and design for Pembina Pipeline Corporation regarding the AltaLink Heartland 500kV power line project
  • AC Electrical Interference modeling and design for Imperial Oil Limited regarding the AltaLink Heartland 500kV power line project
  • AC Grounding design and installation at the Enmax Shepard Energy Facility for ATCO Pipeline ESD Valve Site
  • Site specific designs for the CNRL gathering facilities affected by the Cassils-Bowmanton power line project.
  • AC Electrical Interference studies on nine CNRL gathering facilities affected by the Cassils-Bowmanton power line project.
  • AC Electrical Interference study for the Pembina Pipelines facilities affected by the new ATCO Electric Edith Lake power line.
  • AC Electrical Interference study for Crew Energy Tilley oil gathering system affected by the Cassils-Bowmanton power line project.
  • AC Electrical Interference study for the Penn West Petroleum Meekwap Sales Line.
  • AC Electrical Interference study for the relocation of BC Hydro distribution power lines adjacent to the Kinder Morgan Trans Mountain pipeline near Bairiere BC.
  • DC Electrical Interference project for Pembina Pipelines on their facilities are affected by the proposed WATL 500kV HVDC power line.
  • AC Electrical Interference study for the proposed Williams Horizon Lateral.
  • AC Electrical Interference study program on Kinder Morgan 6” Jet Fuel line for Kinder Morgan - Canada on Lulu Island.
  • DC Electrical Interference study on Kinder Morgan 6” Jet Fuel line due to the operation of the Canada Line Sky Train on Sea Island in Vancouver.
  • Supervision of AC Safety requirements for excavations on the ATCO Pipelines excavations and repairs of pipelines on the Homeglen system adjacent to the 500kV power line 1209L.
  • AC Electrical Interference study on the installation of new Epcor duct banks and transformers near to the Kinder Morgan - Canada Trans Mountain pipeline.
  • AC Electrical Interference study for the Pembina Pipeline Corporation facilities affected by the new AltaLink Spruce Grove 595S substation and area growth.
  • AC Electrical Interference study for the ATCO Pipelines facilities affected by the new AltaLink Spruce Grove 595S substation and area growth.
  • AC Electrical Interference study for the Penn West Petroleum Drayton Valley pipelines influenced by the new AltaLink power line 673L.
  • AC Electrical Interference study for Pembina Pipeline Corporation on their facilities in Drayton Valley affected by the new AltaLink power line 673L.
  • Evaluated the AC Electrical Interference impact of the proposed upgrades to the ATCO Electric 9L990 (future 9L23) power line with respect to the NPS12 Boreal Pipeline belonging to Williams Energy (Canada) Inc.
  • Evaluated the proposed AltaLink Heartland crossing of the NPS12 Boreal Pipeline belonging to Williams Energy (Canada) Inc.
  • AC Electrical Interference study and site specific designs for the AltaLink Yellowhead Transmission Reinforcement Project – Drayton Valley on behalf of Pembina Pipelines.
  • AC Electrical Interference study and site specific designs for the AltaLink Yellowhead Transmission Reinforcement Project - Edson to Hinton on behalf of Kinder Morgan - Canada.
  • AC Electrical Interference study for the AltaLink Yellowhead Transmission Reinforcement Project - Edson to Hinton on behalf of ATCO Pipelines.
  • Grounding and gradient system design and installation for the ATCO Pipeline Homeglen Block Valve site.
  • Initial AC Electrical Interference study of the proposed KLNG pipeline at Kitimat, British Columbia.
  • AC Electrical Interference study of the CNRLSeptimus gathering system.
  • AC Electrical Interference study on TransCanada pipelines due to the operation of the AC Mitigation systems on the Williams Energy Boreal Pipeline.
  • AC Safety Supervision for work at the ATCO Pipelines Edmonton Hydrogen Delivery Station.
  • AC Electrical Interference study on the AltaGas Utilities and MEC pipelines affected by the proposed AltaLink 325S Substation and associated power lines in Leduc County.
  • AC Electrical Interference study on the Provident and Williams pipelines in and around Josephburg Substation near Shell Scotford.
  • AC Electrical Interference study on the Caltex Energy Kakwa gas gathering and sales pipeline system.
  • AC Electrical Interference study on the ConocoPhillips Canada Surmont Lateral Pipelines.
  • AC Electrical Interference study on Sarcee Trail in Calgary for ATCO Pipelines.
  • Design and installation of cathodic protection systems for steel waterlines and fittings on the Lamont Water Reservoir project.
  • Evaluated AC corrosion concerns near Jones Hill rectifier on the TransMountain Pipeline for Kinder Morgan - Canada.
  • AC Electrical Interference study for the Williams Energy Boreal Pipeline.
  • AC Electrical Interference study for the 24NPS Nipisi Pipeline Project for Pembina Pipeline Corporation.
  • Cathodic Protection design for the Noel Gas Gathering system belonging to BP Canada Energy Company.
  • AC Electrical Interference study for the Noel Gas Gathering system in British Columbia belonging to BP Canada Energy Company.
  • AC Electrical Interference study, design and installation for the ATCO Pipelines Priddis Extension Project.
  • AC Electrical Interference study, design and installation for the AltaLink Management SW Transmission Development Project 240 kV as it affects the ATCO Pipelines Willowbrook Laterals.
  • AC Grounding design and installation at the ATCO Pipelines Keephills Natural Gas Meter Station attached to the TransaltaKeephills Power Generation Station.
  • AC Electrical Interference study for the AltaLink Management 240 kV Watson Creek power line project with regards to Kinder Morgan - Canada and ATCO Pipelines.
  • Provided AC Safety documentation, materials and training for the installation phase of the Inland Relocation project.
  • Cathodic Protection design and installation for the ATCO Pipelines Inland Relocation project.
  • AC Electrical Interference study for the ATCO Pipelines Inland Relocation project.
  • AC Grounding design and installation for the ATCO Pipelines Prairie Creek Buy-back Station in Grande Cache.
  • AC Electrical Interference study for the ATCO Pipelines Bragg Creek pipeline system.
  • AC Electrical Interference study for the ATCO Pipelines SEEP pipeline system in the Edmonton area.
  • AC Electrical Interference study and installation for ATCO Pipelines Muskeg River Pipeline project.
  • AC Grounding design and installation for the ATCO Pipelines Cloverbar Natural Gas Meter Station attached to the EpcorCloverbar Power Generation Station.